since 1984
Project Galleries
  • Project Homepage

>Back to Gemstone Projects

Sheikh Zayed Bin Sultan Al Nahyan Mosque, Abu Dhabi

The color carved and shaped marble relief work for the mosque walls took nine months to complete, with a total of 550 square meters.The Minbar Stairway is inlaid with premium White Mother of Wood on wood panels. The flooring is also inlaid with gemstone and marble in an exquisite leaf design.

Copyright 2013 Site Design by Agape Tile LLC. All Rights Reserved.                                                                                                     www.agapetile.com HOME   
http://www.agapepoolsandspas.com/                                                                                                                         Phone:  910-571-9765 Email: candace@agapetile.com